Inspection Types

The following types of inspections can be scheduled with the Building Department. Please schedule inspections in My City Inspector as outlined in Permits and Inspections. If you do not see the inspection type you need or have any other inspection related questions, please contact our Building Department.

Building Specialty

  • Concrete
  • Masonry
  • Soils/Geotechnical
  • Steel/Welding
  • Spray-Applied Fireproofing
  • Smoke Control Systems
  • Stormwater/Wastewater
  • Elevator/Conveyance
  • Boiler
  • Health Department (Tri-County)
  • CDPS/DFPC Sign-Off Complete

Electrical

  • Underground
  • Rough-In
  • Above Ceiling
  • Service/Equipment
  • Generator/EM Power
  • Electrical Final

Fire Safety

  • Underground
  • Rough-In
  • Stationary Fire Pump
  • Acceptance
  • Final

Building

  • Earthwork/Excavation
  • Concrete
  • Rough Frame
  • Drywall (GYP)
  • Fire Resistant Penetrations
  • Insulation/Energy Efficiency
  • Above Ceiling
  • Water/Damp Proofing
  • Roofing
  • Building Final Inspection

Fire Alarm

  • Record of Completion
  • Rough-In
  • Pre-Test Verification
  • Fire Alarm Final

Mechanical

  • Piping Insulation/Labeling
  • Underground
  • Rough-In, Process Piping
  • Rough-In, Refrigeration
  • Rough-In, Duct/Sheet Metal
  • Mechanical Final

Med Gas

  • Piping Protection/Labeling
  • Initial Test/Rough-In
  • Standing 24hr Pressure Test - Start
  • Standing 24hr Pressure Test - Complete
  • Med Gas Verification
  • Med Gas Final

Plumbing

  • Piping Insulation/Labeling
  • Underground
  • Rough-In
  • Above Ceiling
  • Roof Drains/Overflow
  • Water Heater
  • Waste & Vent
  • Plumbing Final

Fuel Gas

  • Pipe Labeling
  • Underground
  • Rough-In
  • Fuel Gas Final

Admin

  • TCO Request
  • COC Request
  • CO Request

Stormwater

  • Initial Inspection (Pre-Con) - Initial inspection of BMPs installed before work begins. Scheduled by the contractor.
  • Compliance Inspection - Monthly routine inspections scheduled by the Regulatory and Compliance Manager.
  • Compliance Follow-Up - Follow-Up inspections are scheduled 14 days after a failed compliance inspection.
  • Final Compliance Inspection - Final inspection and acceptance after all work has been completed, controls removed and all areas have been stabilized.

 

Contact Us

Building Department
Campus Services Building
Mail Stop F410
1945 Wheeling St., Room 258
Aurora, CO 80045

Tony Miller
Campus Building Official
antonio.miller@cuanschutz.edu
(303) 724-0869

Mark Beall
Multi-Trade Plumbing Inspector
mark.beall@cuanschutz.edu
(303) 724-9533

Frank Gibney
Multi-Trade Electrical Inspector
frank.gibney@cuanschutz.edu
(303) 724-4260

Iain Baker
Compliance Manager/
Stormwater Inspector
iain.baker@cuanschutz.edu
720-498-2078

CMS Login