RFPs posted prior to March 1, 2024:​

Project NumberProject NameDocumentCampusArticle Date
23-159479 Project A / 23-145834 Project B R1 N Bldg. 7th Flr Reno Project A / R2 Bldg. 9th Flr Lab Reno Project B

2024.01.24 - Bid Tab Sheet

2024.02.23 Addendum 04

2024.02.23 Addendum 03

2024.02.21 Addendum 02

2024.02.16 Addendum I

Pre-Bid Sign in -R1 N Bldg. 7th flr Reno - PN23-149479 R2 9th flr Lab Reno PN23-145834

AFB-CSBV R2 9th & R1 N 7th

 

2024.01.05 R1 N 7TH FLOOR_100% CDsCOMBINED_Stamped_20240105

2024.01.05 R1 7th Floor_Specifications_Vol.1_Stamped

2024.01.05 R1 7th Floor_Specifications_Vol.2

 

2023.12.19 R2 9th 100% Signed_Stamped CDs

2023.12.19 R2 9th 100% CD Specs

CU Anschutz

3/6/2024

2/26/3034

2/23/2024

2/21/2024

2/16/2024

2/9/2024

1/30/2024

 

1/30/2024

 

1/30/2024

1/30/2024

 

1/30/2024

1/30/2024

21-174017

Upgrade Elec Sys, CU Den Bldg.

2024.01.24 - Bid Tab Sheet

Addendum 2 - CU Denver electrical replacement

Addendum 1 - CU Denver electrical replacement 1.26.24 POSTED

24-0109 Advertisement for bids CU Denver electrical upgrade

CU-Denver Building-Electrical Upgrades-PROJECT MANUAL-100�-2023.12.01

CU-Denver Building-Electrical Upgrades-PROJECT DRAWINGS-100�-2023.12.01

CU Denver

2/29/2024

2/13/2024

1/26/2024

 

1/16/2024

1/16/2024

 

1/16/2024

24-133515

24-133517

24-133518

AHEC North Classroom Building Renovations

CU Denver Building Reno

AHEC 5th Street Hub Renovations

CMGC Score matrix Boulder Creek

RFP CMGC Addn 3 - Engr-Arts&Media Lab Reno Projects

24_0201 - CMGC Score matrix

RFP CMGC Addn 2 - Engr-Arts&Media Lab Reno Projects

RFP CMGC Addn 1- AHEC Bldr Crk Reloc Projects

AHEC Boulder Creek Relocation - CMGC-RFP

CU Denver

2/29/2024

1/31/2024

1/31/2024

1/10/2024

 

12/22/2023

 

12/20/2023

21-107321Sheridan Health HRSA Grant Reno

Bid Tab Sheet

2023.11.07 Sheridan Health Grant_Stamped and Signed Electrical Drawings

2023.11.07 Sheridan Health Grant_Stamped and Signed Mechanical Drawings

2024.01.16 Addendum III

 

2024.01.11 Addendum II

2023.01.04 Sheridan Health Addendum 1

Pre-Bid Sign in - Sheridan Health HRSA Amer Rescue Fund PN 21-107321

Sheridan Health HRSA Grant Reno Advertisement for Bid

2023.31.08 Sheridan Health Grant - 100% DD - Specs

2023.31.08 Sheridan Health Grant - 100% DD - Drawings

CU Anschutz

1/23/2024

1/17/2024

1/17/2024

 

1/17/2024

 

1/12/2024

1/5/2024

1/5/2024

12/20/2023

12/20/2023

12/20/2023

23-128743CU Anschutz Quentin Street Lights

2024-01-31- Addendum 2-AFB closed-Quentin St. Project #23-128743

Bid Tab sbp-6132

2024-01-16- Addendum 2-Bid Date Revised for Quentin St.-FINAL

 

Addendum 1 - prebid questions for Quenstin St.

 

Pre-Bid Sign in - CU Anschutz Quentin Street Lights PN23-128743

 

2023.11.28-OSA-AFB-1-23-128743-CU Anschutz Quentin Street Lights-Rev1

 

 

Specifications

 

2023.12.06-AMC_Lighting Plans_Signed Sealed-100%- Prebid notes

CU Anschutz

1/31/2024

1/23/2024

1/16/2024

 

12/14/2023

 

12/6/2023

 

11/20/2023

 

11/20/2023

 

11/20/2023

23-117045Dental School Student Lounge Renovation

Bid Tab sbp-6132

 

2023.12.08 Addendum 2

 

CU Dental School Student Lounge Addendum 1

23_1127 Pre Bid Meeting Attendance List - 23-117045

 

SM- AD for bids - Dental School Lounge Reno - SCPP Only

 

CU Dental School Lounge 100%_ProjectManual

 

CUDentalSchoolLounge 100% CDs

CU Anschutz

12/12/2023

 

12/5/2023

 

12/4/2023

11/27/2023

 

11/17/2023

 

11/17/2023

 

11/17/2023

23-118391Fitz Building Ground N Reno NG015-NG016

Bid Tab sbp-6132

 

2023.11.28 Fitz Bldg Grnd_Addendum 01

 

Pre-Bid Sign in - Fitz Building Ground N Reno NG015-NG016 PN23-118391

 

Fitz Bldg Grnd NG015-NG016 Advertisement for Bid II

 

 

2023.09.20 Fitz NG015-NG016 100% STAMPED CDs ProjectManual

 

2023.09.23 Fitz NG015-NG016 100% Stamped CDs with Responses

CU Anschutz

12/6/2023

 

11/28/2023

 

11/15/2023

 

11/9/2023

 

 

11/9/2023

 

 

11/9/2023

21-115057CU Denver Business School Roof Deck Repairs

Bid Tab sbp-6132

 

Pre-Bid Sign in - CU Denver Business School Roof Deck Repairs PN21-115057

 

2021.11.01 - Advertisement CU Denver Business School Roof Deck Repairs PN 21-115057

 

CU Denver Business School - Roof Draininage Repairs CD Specs

 

CU Denver Business School - Roof Draininage Repairs CD Drawings

CU Denver

12/12/2023

 

11/14/2023

 

11/1/2023

 

11/1/2023

 

 

 

11/1/20223

23-110899PERINATAL RESEARCH FACILITY POWER HVAC BOILER
UPGRADES

Bid Tab sbp-6132

23_1201 Addn 4- PRF Power HVAC Boiler Upgrds_Final

 

23_1129 Addn 3- PRF Power HVAC Boiler Upgrds_Final

 

23_1120 Addn 2- PRF Power HVAC Boiler Upgrds_Final

 

23_1116 Addn 1- PRF Power HVAC Boiler Upgrds_Final

 

Addendum 1 - Revised & Added Spec Sections_Rev

 

Addendum 1 - Revised Drawing Sheets

 

Addendum 1 - EH&S Supp Info Docs

 

23_1106 Pre Bid Attendance List

 

Ad for Bids_PRF Power_HVAC_Boiler Upgrds

 

23-110889 PRF- Power HVAC Boiler Upgrades Plans

 

23-110899 PRF Power HVAC Boiler Upgrade Specifications

CU Anschutz

12/8/2023

11/29/2023

 

11/20/2023

 

11/16/2023

 

11/16/2023

 

11/16/2023

 

11/16/2023

 

11/6/22023

 

 

10/30/2023

 

10/30/2023

 

 

10/30/2023

23-180529Fitzsimons Improved Heating Sys., Phase 3 (west wing)

Bid Tab sbp-6132

2023.11.09 - Addendum 01 Form-23-180529 Fitz Htg Sys Imp (West Wing)

 

Pre-Bid Sign in - Fitzs Improved Heating Sys., Phase 3 (west wing) PN23-180529

 

2023.10.23-OSA-23-180529-AFB-Fitz West Side-POSTED

 

Fitz West Wing CD Specs_20230901 - Stamped

 

20230901 - Fitzs Heating West Wing - CD - MECH - Stamped

 

20230829 - Fitzs Heating West Wing - CD - ELEC - Stamped

CU Anschutz

11/29/2023

11/9/2023

 

11/2/2023

 

10/23/2023

 

10/23/2023

 

10/23/2023

 

10/23/2023

23-178871Fitz Bldg. 3rd Reno CSPH Space

23_1020 sbp-6132 Final Tabulation

 

23_1013 Addendum 1 Fitz 3rd CSPH Final

 

Pre-Bid Sign in -Fitz Bldg 3rd Reno CSPH Space PN23-0178871

 

OSA-AFB-1 Fitz 3rd CSPH Adv Final

 

2023_0922 PERMIT CONST PROJECT MANUAL-stamped

 

2023_0927 - FITZ BLDG 3RD RENO CSPH - PERMIT-CONST DOCS - REVISED - stamped

CU Anschutz

10/20/2023

 

10/13/2023

 

10/10/2023

 

10/2/2023

 

10/2/2023

 

 

10/2/2023

23-180525RFP- R1 N Vivarium Air Valve Replacement PH1 of 2

R1N Air Valve Replacement - CMGC Score matrix

 

23_1006 RFP CMGC Addn 1- R1N Vivarium Air Valve Replace_Final

 

23_0925 23-180525 Pre Submittal Attendance

 

R1N Vivarium VAV Replace - IPD-CMGC-RFP_Final

CU Anschutz

11/27/2023

 

10/6/2023

 

10/2/2023

 

9/7/2023

24-105196CU Anschutz Parking Repairs Phase 2

Bid Tab sbp-6132

 

 

2023.10.06-CU Anschutz Parking Repairs Phase 2-Adendum 01

 

Pre-Bid Sign in - CU Anschutz Parking Repairs Phase 2 PN24-105196

 

CU Anschutz Parking Lot Repairs Phase 2 Project Manual

 

CU Anschutz Parking Lot Repairs Phase 2 - Report and Plans

 

2023.08.25-OSA-AFB-1-Project 24-105196-Parking Repairs Phase 2

CU Anschutz

9/13/2023

 

 

9/6/2023

 

 

9/6/2023

 

 

8/29/2023

 

8/29/2023

 

8/25/2023

22-162936LSC Boiler Re-piping

Bid Tab sbp-6132

 

UCD - LSC Boiler Repipe - Addendum 01 PACKAGE

 

Pre-Bid Sign in - LSC Boiler Re-pipping

 

23_0720_Advertisement for bids

 

_220016 - LSC Boiler Repipe - Re-Issued Bid Doc Specs COMBINED


 

_220016 - LSC Boiler Repipe - Re-Issued Bid Doc Drawings COMBINED

CU Denver

9/21/2023

 

8/18/2023

 

8/7/2023

 

7/20/2023

 

7/20/2023

 

 

 

7/20/2023

23-102226CU Anschutz Parking Repairs

Bid Tab sbp-6132

 

2023.07.10-CU Anschutz Parking Repairs-#23-102226-Wage Determination-Addendum 02

 

2023.06.30-CU Anschutz Parking Repairs-#23-102226-Addednum 1

Pre-Bid Sign in - CU Anschutz Parking Repairs PN23-102226

06-06-2023-OSA-AFB-23-102226-CU Anschutz Parking Repairs

23-012226 CU Anschutz Parking Lot Repairs Proj Man 06-06-2023

CONTRACTOR Review - CU Anschutz Parking Lot Repairs

CU Anschutz

7/18/2023

 

7/10/2023

 

 

6/30/2023

 

6/20/2023

 

6/6/2023

 

6/6/2023

 

6/6/2023

22-122837Fitzsimons Building (Q20) - Phase 1 Roof Anchors and Fall Protection

Bid Tab sbp-6132

 

23_0627 - CUA Fitz Bldg Ph1 Roof Anchors Addendum 1

 

PH 1 Roof Anchors and Fall Protection - PreBidSign In

 

Fitz Bldg Ph1 Roof Anchors & Fall Protect - Ad For Bids

 

Fitzsimons Bldg- FAFP_100% Specification

 

CU Anschutz - Fitzsimons Bldg - Drawings

CU Anschutz

7/7/2023

 

6/28/2023

 

6/15/2023

 

6/5/2023

 

6/5/2023

 

6/5/2023

21-164329LSC Repair Upper Plaza

Bid Tab sbp-6132

 

Addendum 2

 

Addendum 1

 

Pre-Bid Sign in - LSC Repair Upper Plaza PN21-164329

 

OSA-AFB-1 CU Denver LSC Repair Upper Plaza 21-164329 RFP

 

LSC Repair Upper Plaza 100_ CD Specs 04-26-2023 signed

 

Lawrence Street Center Plaza Repairs - 100_ Construction Documents REV. 1 - Signed and Stamped

CU Denver

7/12/23

 

6/29/2023

 

6/9/2023

 

6/7/2023

5/24/2023

 

 

5/24/2023

 

 

5/24/2023

22-175251AO1 2023-075M22 Repair Ext Curtain Wall

AO1 Repair Ext Curtain Walls - Bid Tab

23_0531 ACADEMIC 1 FIX CURTAINWALL LEAKS PN 22-175251 Final CDs

23_0531 AO1 Curtain Addendum 1 Final

 

2023_00501 OSA_AFB AO1

23_0508 Specification Book AO1

23_0501 AO1 FIX CURTAINWALL LEAKS 100% CDs

CU Anschutz

6/20/2023

6/1/2023

6/1/2023

 

5/8/2023

5/8/2023

5/8/2023

23-109856CU Anschutz AES Radio System Upgrade

2 - Addendum Form TLH Fire

1 - Addendum Form TLH Fire R1

OSA-AFB-1 CU Anschutz AES Radio System Upgrade 23-109856

2023.02.17 CU Anschutz AES RFP

CU Anschutz

6/5/2023

5/31/2023

5/2/2023

 

5/2/2023

23-152052CU Anschutz Denver 2023 SCPP

Addendum 2 - CU Anschutz Denver 2023 SCPP

Mandatory Pre-Submittal Meeting - CU Anschutz Denver 2023 SCPP

Addendum 1 - CU Anschutz Denver 2023 SCPP

 

IPD-CMGC-RFP 2023_0328 final

 

Advertisement - 2023 SCPP

CU Anschutz | Denver

4/18/2023

4/11/2023

4/3/2023

 

3/28/2023

 

3/28/2023

21-174018Fitzsimons Improved Heating Sys, Bldg. 500  

Addendum 3 - Fitzsimons Improved Heating Sys, Bldg. 500-Bid Date Revised

 

2023.05.16-Fitzsimons Imp Htg Sys, Bldg. 500 Addendum 2 Form Pre Bid Questions-Revised

Prebid Sign In - Fitzsimons Improved Heating Sys, Bldg. 500

Addendum 1 - Fitzsimons Improved Heating Sys, Bldg. 500

 

Fitz Improved Htg Sys, Bldg 500, Phase 2 Full CD and Specs

 

20607 B500 P2 HEATING MECH

 

20607 B500 P2 HEATING SPECS

 

20607_B500 P2 HEATING ELEC

 

2023-03-03-AD - Fitzsimons Improved Heating Sys, Bldg. 500 PN21-174018

 

 

 

CU Anschutz

5/17/2023

 

5/16/2023

 

5/4/2023

4/5/2023

 

3/15/2023

 

 

3/15/2023

 

3/15/2023

 

3/15/2023

 

3/9/2023

 

 

 

 

 

 

23-144174Education 1 Building 4th Floor – Nursing Simulation

Oral Interview CMGC Score Matrix

ED1 4th Flr Nursing Sim Scoring Matrix

RFP CMGC Addn1- ED1 4th Flr Nursing Sim_Final

23_0125 ED1 4th Fl - CON Sim CMGC-RFP

CU Anschutz

4/6/2023

3/17/2023

2/22/2023

2/1/2023

22-117960ED 2 N 4th Floor Reno Rms 4223 4224 4225

2023.02.24 ED 2 N 4th Flr Reno Bid Tab sbp-6132

2023.02.08 Addendum 1 - Ed2N 4th Reno Rooms

Pre-Bid Meeting Attendance Template

2023_0106 OSA_AFB Final

PN 22-117960 ED 2 N 4th Reno Project Manual

CU Anschutz ED2N 4th Floor Renovation_100% CD Drawings Stamped 01.25.23

CU Anschutz

3/6/2023

2/9/23

1/27/23

1/13/23

1/13/23

1/25/23

22-106819

ARTS Ft. Logan Reno Kitchen Bldg 16

2022.14.12 Project Addendum 1

Pre-Bid Meeting Attendance

2022.11. 08 OSA-AFB-1 DRAFT

ARTS RENO BLDG 16 100% CD FOR CONSTRCUTION DRAWINGS

22-106819 CU ANSCHUTZ1ARTS RENO BLDG 16 100% CD FOR CONSTRCUTION SPEC SIGNED AND STAMPED 04-12-22 II

 

 

CU Anschutz

12/14/2022

12/08/2022

11/18/2022

11/18/2022

11/18/2022

22-177348Lynx Crossing Gym and Lounge Renovation

23_0509 - Lynx Crossing CMGC Score submittal matrix PDF summary

Addendum 2 - Lynx Crossing - CMGC RFP- 04.18.2023

23_0330 - Addendum1- Lynx Crossing Gym and Lounge Reno

2022.10.14 - Lynx Crossing Gym and Lounge Reno 22-177348 Sign in Sheet

2022.10.07 - RFP CMGC - Lynx Crossing Gym and Lounge Renovation 22-177348 - FINAL

CU Denver

5/23/2023

4/18/2023

3/30/2023

 

10/14/2022

 

10/7/2022